DOWNLOAD NOW
Name Bytes Width Height DPI Media Type
small 260376 738 477 72 image/jpeg
medium 534370 1277 825 300 image/jpeg
large 1185452 2157 1394 300 image/jpeg
x_large 3996294 3928 2539 300 image/jpeg
xx_large 15913293 6000 3879 300 image/jpeg
Add to Cart

Image Information

  • Artist amgun
  • Image ID 2186489707
  • Date Created November 23, 2024
  • Collection iStock Essentials
  • Style Photography
  • Orientation Horizontal
  • Release Info No release required

Related Premium Stock Photos

Our creative team would like to recommend to you a few photos in the same category:

Architecture blueprint on Architecture blueprint on
Abstract technological Abstract technological
Blueprints Engineering Mechanical engineering
Scheme of the LNG plant The territory of the LNG
Blue-white construction Blue-white construction
Mechanical engineering Mechanical engineering
Architecture blueprint on Architecture blueprint on
house project plan house project plan
Technical drawing Technical drawing
Dark electronic circuit Dark electronic circuit
blueprint rolls and blueprint rolls and
blueprint office blue print
House plan project House plan project
Engineering backgrounds Mechanical drawings on a
Architectural drawing Architectural drawing
Vector engineering Vector engineering
Mechanical engineering Mechanical engineering
Engineering backgrounds Mechanical engineering
Blueprints Mechanics Mechanical Engineering
Mechanical Engineering Mechanical Engineering
Blueprints Mechanics Mechanical Engineering
Another great penthouse another set of blue
House plan project House plan project
Technical illustration Blue background
Technical illustrations Blueprint Vector